On Monday, GPS robotics mechanical is working on MK cad, they took apart a Kasi (metal structure with a motor attached), and cleaned gears; media continued forward with the mascot design and safety videos; programming worked on their coding skills; electrical was stripping wires and soldering; and two other members were working on sponsorship packets.
On Wednesday, mechanical was cleaning gear boxes; electrical did a check up on electrical skills; programming worked on programming skills; and media finalized the mascot drawing.
Leave a comment